Canadian Energy Regulator Onshore Pipeline Regulations (SOR/99-294)
Full Document:
- HTMLFull Document: Canadian Energy Regulator Onshore Pipeline Regulations (Accessibility Buttons available) |
- XMLFull Document: Canadian Energy Regulator Onshore Pipeline Regulations [111 KB] |
- PDFFull Document: Canadian Energy Regulator Onshore Pipeline Regulations [285 KB]
Regulations are current to 2024-10-30 and last amended on 2022-09-27. Previous Versions
52 (1) A company shall immediately notify the Regulator of any incident relating to the construction, operation or abandonment of its pipeline and shall submit a preliminary and detailed incident report to the Regulator as soon as is practicable.
(2) After notification of an incident, an inspection officer may partially or completely relieve a company from the requirement to submit a preliminary and detailed incident report.
- Date modified: