Canadian Energy Regulator Onshore Pipeline Regulations (SOR/99-294)
Full Document:
- HTMLFull Document: Canadian Energy Regulator Onshore Pipeline Regulations (Accessibility Buttons available) |
- XMLFull Document: Canadian Energy Regulator Onshore Pipeline Regulations [111 KB] |
- PDFFull Document: Canadian Energy Regulator Onshore Pipeline Regulations [285 KB]
Regulations are current to 2026-05-26 and last amended on 2022-09-27. Previous Versions
55 (1) A company shall conduct audits, with a maximum interval of three years, of the following programs:
(a) the emergency management program referred to in section 32;
(b) the integrity management program referred to in section 40, including the pipeline control system referred to in section 37;
(c) the safety management program referred to in section 47;
(d) the security management program referred to in section 47.1;
(e) the environmental protection program referred to in section 48; and
(f) the damage prevention program referred to in section 47.2.
(2) The documents prepared following the audit shall include
(a) any deficiencies noted; and
(b) any corrective action taken or planned to be taken.
- SOR/2013-49, s. 21
- SOR/2016-134, s. 2
Page Details
- Date modified: