Skip to main content
Skip to primary navigation
Department of Justice
www.justice.gc.ca
Common menu bar
Français
Home
Contact Us
Help
Search
canada.gc.ca
Breadcrumb
Main Page
>
Consolidated Regulations
>
SOR
/2009-315 - Table of Contents
Table of Contents
Canada Oil and Gas Drilling and Production Regulations (
SOR
/2009-315)
Full Document:
HTML
|
XML
[137 KB]
|
PDF
[472 KB]
Regulations are current to 2012-01-24 and last amended on 2009-12-31.
Previous Versions
Enabling Act:
CANADA OIL AND GAS OPERATIONS ACT
Notes :
See coming into force provision and notes, where applicable.
Shaded provisions are not in force.
Help
Search within these regulations:
Canada Oil and Gas Drilling and Production Regulations
1 -
INTERPRETATION
2 -
PART 1
BOARD’S POWERS
2 -
Spacing
3 -
Names and Designations
5 -
PART 2
MANAGEMENT SYSTEM, APPLICATION FOR AUTHORIZATION AND WELL APPROVALS
5 -
Management System
6 -
Application for Authorization
10 -
Well Approval
14 -
Suspension and Revocation of a Well Approval
15 -
Development Plans
17 -
PART 3
OPERATOR’S DUTIES
17 -
Availability of Documents
18 -
Management System
19 -
Safety and Environmental Protection
22 -
Storing and Handling of Consumables
23 -
Handling of Chemical Substances, Waste Material and Oil
24 -
Cessation of a Work or Activity
25 -
PART 4
EQUIPMENT AND OPERATIONS
25 -
Wells, Installations, Equipment, Facilities and Support Craft
28 -
Drilling Fluid System
29 -
Marine Riser
30 -
Drilling Practices
31 -
Reference for Well Depths
32 -
Directional and Deviation Surveys
33 -
Formation Leak-Off Test
34 -
Formation Flow and Well Testing Equipment
35 -
Well Control
39 -
Casing and Cementing
42 -
Waiting on Cement Time
43 -
Casing Pressure Testing
44 -
Production Tubing
45 -
Monitoring and Control of Process Operations
46 -
Well Completion
47 -
Subsurface Safety Valve
48 -
Wellhead and Christmas Tree Equipment
49 -
PART 5
EVALUATION OF WELLS, POOLS AND FIELDS
49 -
General
51 -
Testing and Sampling of Formations
52 -
Formation Flow Testing
53 -
Submission of Samples and Data
56 -
PART 6
WELL TERMINATION
56 -
Suspension or Abandonment
59 -
Installation Removal
60 -
PART 7
MEASUREMENTS
60 -
Flow and Volume
62 -
Testing, Maintenance and Notification
63 -
Transfer Meters
64 -
Proration Testing Frequency
65 -
PART 8
PRODUCTION CONSERVATION
65 -
Resource Management
66 -
Commingled Production
67 -
Gas Flaring and Venting
68 -
Oil Burning
69 -
PART 9
SUPPORT OPERATIONS
69 -
Support Craft
71 -
Safety Zone
72 -
PART 10
TRAINING AND COMPETENCY
73 -
PART 11
SUBMISSIONS, NOTIFICATIONS, RECORDS AND REPORTS
73 -
Reference to Names and Designations
74 -
Surveys
75 -
Incidents and Near-misses
76 -
Submission of Data and Analysis
77 -
Records
78 -
Meteorological Observations
79 -
Daily Production Record
80 -
Management of Records
81 -
Formation Flow Test Reports
82 -
Pilot Scheme
83 -
Daily Reports
84 -
Monthly Production Report
85 -
Annual Production Report
86 -
Environmental Reports
87 -
Annual Safety Report
88 -
Well History Report
89 -
Well Operations Report
90 -
Other Reports
91 -
PART 12
CONSEQUENTIAL AMENDMENTS, TRANSITIONAL PROVISION, REPEALS AND COMING INTO FORCE
91 -
Consequential Amendments
91 -
Canada Oil and Gas Certificate of Fitness Regulations
98 -
Canada Oil and Gas Installations Regulations
102 -
Transitional Provision
103 -
Repeals
105 -
Coming Into Force
SCHEDULE
Primary navigation (left column)
Laws
Main Page
Consolidated Acts
Consolidated Regulations
Constitutional Documents
Annual Statutes
Search
Basic Search
Advanced Search
Resources
Table of Public Statutes and Responsible Ministers
Table of Private Acts
Consolidated Index of Statutory Instruments
Related Resources
Help
Accessibility
FAQ
General
Search Help
PDF Help
How to Create Stable Links
Printing
Glossary
Important Note
Contact Us
Proactive Disclosure
Proactive Disclosure