Canadian Energy Regulator Act (S.C. 2019, c. 28, s. 10)
Full Document:
- HTMLFull Document: Canadian Energy Regulator Act (Accessibility Buttons available) |
- XMLFull Document: Canadian Energy Regulator Act [820 KB] |
- PDFFull Document: Canadian Energy Regulator Act [1356 KB]
Act current to 2026-06-17 and last amended on 2026-03-26. Previous Versions
Marginal note:Review
127 (1) On receipt of a request made under section 125, the Commission must conduct the review or cause the review to be conducted by a person designated under subsection 116(1.1).
Marginal note:Restriction
(2) The Commission must conduct the review if the notice of violation was issued by a person designated under subsection 116(1.1).
Page Details
- Date modified: