Canadian Energy Regulator Act (S.C. 2019, c. 28, s. 10)

Act current to 2026-06-17 and last amended on 2026-03-26. Previous Versions

Marginal note:Existing terms and conditions

  •  (1) Terms and conditions in respect of a pipeline that were, at any time before July 3, 2013, imposed under section 108 of the National Energy Board Act, are considered to be conditions set out in the certificate issued, or order made under section 214, as the case may be, in respect of the pipeline.

  • Marginal note:Construction without leave

    (2) If, at any time before July 3, 2013, the Minister of Transport or the National Energy Board had provided, under section 108 of the National Energy Board Act, that leave under that section was not necessary because the pipeline was to be constructed in accordance with certain orders, regulations, plans and specifications, a company must not construct the pipeline other than in accordance with those orders, regulations, plans and specifications or as specified by the Commission.

Page Details

Date modified: