Carriage by Air Act (R.S.C., 1985, c. C-26)
Full Document:
- HTMLFull Document: Carriage by Air Act (Accessibility Buttons available) |
- XMLFull Document: Carriage by Air Act [289 KB] |
- PDFFull Document: Carriage by Air Act [520 KB]
Act current to 2024-11-26 and last amended on 2003-11-04. Previous Versions
SCHEDULE I(Sections 2, 3, 4, 5 and 6 and Sch. II)
Convention for the Unification of Certain Rules Relating to International Carriage by Air. Signed at Warsaw, October 12, 1929
The President of the German Reich, the Federal President of the Republic of Austria, His Majesty the King of the Belgians, the President of the United States of Brazil, His Majesty the King of the Bulgarians, the President of the National Government of the Republic of China, His Majesty the King of Denmark and Iceland, His Majesty the King of Egypt, His Majesty the King of Spain, the Chief of State of the Republic of Estonia, the President of the Republic of Finland, the President of the French Republic, His Majesty the King of Great Britain, Ireland and the British Dominions beyond the Seas, Emperor of India, the President of the Hellenic Republic, His Most Serene Highness the Regent of the Kingdom of Hungary, His Majesty the King of Italy, His Majesty the Emperor of Japan, the President of the Republic of Latvia, Her Royal Highness the Grand Duchess of Luxemburg, the President of the United States of Mexico, His Majesty the King of Norway, Her Majesty the Queen of the Netherlands, the President of the Republic of Poland, His Majesty the King of Roumania, His Majesty the King of Sweden, the Swiss Federal Council, the President of the Czechoslovak Republic, the Central Executive Committee of the Union of the Soviet Socialist Republics, the President of the United States of Venezuela, His Majesty the King of Yugoslavia;
Having recognized the advantage of regulating in a uniform manner the conditions of international carriage by air in respect of the documents to be used for such carriage and of the liability of the carrier, have nominated to this end their respective Plenipotentiaries, who, being thereto duly authorized, have concluded and signed the following convention: —
CHAPTER I
Scope — Definitions
Article 1
(1) This Convention applies to all international carriage of persons, baggage or cargo performed by aircraft for reward. It applies equally to gratuitous carriage by aircraft performed by an air transport undertaking.
(2) For the purposes of this Convention the expression “international carriage” means any carriage in which, according to the agreement between the parties, the place of departure and the place of destination, whether or not there be a break in the carriage or a transhipment, are situated either within the territories of two High Contracting Parties, or within the territory of a single High Contracting Party, if there is an agreed stopping place within a territory subject to the sovereignty, suzerainty, mandate or authority of another Power, even though that Power is not a party to this Convention. A carriage without such an agreed stopping place between territories subject to the sovereignty, suzerainty, mandate or authority of the same High Contracting Party is not deemed to be international for the purposes of this Convention.
(3) A carriage to be performed by several successive air carriers is deemed, for the purposes of this Convention, to be one undivided carriage, if it has been regarded by the parties as a single operation, whether it had been agreed upon under the form of a single contract or of a series of contracts, and it does not lose its international character merely because one contract or a series of contracts is to be performed entirely within a territory subject to the sovereignty, suzerainty, mandate or authority of the same High Contracting Party.
[Note: The paragraphs of the Convention shown in italics were deleted and replaced (except in the case of paragraph (2) of Article 20) by the Protocol set out in Schedule III, infra.]
Article 2
(1) This Convention applies to carriage performed by the State or by legally constituted public bodies provided it falls within the conditions laid down in Article 1.
(2) This Convention does not apply to carriage performed under the terms of any international postal Convention.
CHAPTER II
Documents of Carriage
Section 1. — Passenger Ticket
Article 3
(1) For the carriage of passengers the carrier must deliver a passenger ticket which shall contain the following particulars:
(a) the place and date of issue;
(b) the place of departure and of destination;
(c) the agreed stopping places, provided that the carrier may reserve the right to alter the stopping places in case of necessity, and that if he exercises that right, the alteration shall not have the effect of depriving the carriage of its international character;
(d) the name and address of the carrier or carriers;
(e) a statement that the carriage is subject to the rules relating to liability established by this Convention.
(2) The absence, irregularity or loss of the passenger ticket does not affect the existence or the validity of the contract of carriage, which shall none the less be subject to the rules of this Convention. Nevertheless, if the carrier accepts a passenger without a passenger ticket having been delivered he shall not be entitled to avail himself of those provisions of this Convention which exclude or limit his liability.
Section 2. — Baggage Check
Article 4
(1) For the carriage of baggage, other than small personal objects of which the passenger takes charge himself, the carrier must deliver a baggage check.
(2) The baggage check shall be made out in duplicate, one part for the passenger and the other part for the carrier.
(3) The baggage check shall contain the following particulars:
(a) the place and date of issue;
(b) the place of departure and of destination;
(c) the name and address of the carrier or carriers;
(d) the number of the passenger ticket;
(e) a statement that delivery of the baggage will be made to the bearer of the baggage check;
(f) the number and weight of the packages;
(g) the amount of the value declared in accordance with Article 22(2);
(h) a statement that the carriage is subject to the rules relating to liability established by this Convention.
(4) The absence, irregularity or loss of the baggage check does not affect the existence or the validity of the contract of carriage, which shall none the less be subject to the rules of this Convention. Nevertheless, if the carrier accepts baggage without a baggage check having been delivered, or if the baggage check does not contain the particulars set out at (3)(d), (f) and (h), the carrier shall not be entitled to avail himself of those provisions of the Convention which exclude or limit his liability.
Section 3. — Air Waybill
Article 5
(1) Every carrier of cargo has the right to require the consignor to make out and hand over to him a document called an “air waybill”; every consignor has the right to require the carrier to accept this document.
(2) The absence, irregularity or loss of this document does not affect the existence or the validity of the contract of carriage which shall, subject to the provisions of Article 9, be none the less governed by the rules of this Convention.
Article 6
(1) The air waybill shall be made out by the consignor in three original parts and be handed over with the cargo.
(2) The first part shall be marked “for the carrier”, and shall be signed by the consignor. The second part shall be marked “for the consignee”; it shall be signed by the consignor and by the carrier and shall accompany the cargo. The third part shall be signed by the carrier and handed by him to the consignor after the cargo has been accepted.
(3) The carrier shall sign on acceptance of the cargo.
(4) The signature of the carrier may be stamped; that of the consignor may be printed or stamped.
(5) If, at the request of the consignor, the carrier makes out the air waybill, he shall be deemed, subject to proof to the contrary, to have done so on behalf of the consignor.
Article 7
The carrier of cargo has the right to require the consignor to make out separate air waybills when there is more than one package.
Article 8
The air waybill shall contain the following particulars:
(a) the place and date of its execution;
(b) the place of departure and of destination;
(c) the agreed stopping places, provided that the carrier may reserve the right to alter the stopping places in case of necessity, and that if he exercises that right the alteration shall not have the effect of depriving the carriage of its international character;
(d) the name and address of the consignor;
(e) the name and address of the first carrier;
(f) the name and address of the consignee, if the case so requires;
(g) the nature of the cargo;
(h) the number of the packages, the method of packing and the particular marks or numbers upon them;
(i) the weight, the quantity and the volume or dimensions of the cargo;
(j) the apparent condition of the cargo and of the packing;
(k) the freight, if it has been agreed upon, the date and place of payment, and the person who is to pay it;
(l) if the cargo is sent for payment on delivery, the price of the cargo, and, if the case so requires, the amount of the expenses incurred;
(m) the amount of the value declared in accordance with Article 22(2);
(n) the number of parts of the air waybill;
(o) the documents handed to the carrier to accompany the air waybill;
(p) the time fixed for the completion of the carriage and a brief note of the route to be followed, if these matters have been agreed upon;
(q) a statement that the carriage is subject to the rules relating to liability established by this Convention.
Article 9
If the carrier accepts cargo without an air waybill having been made out, or if the air waybill does not contain all the particulars set out in Article 8(a) to (i) inclusive and (q), the carrier shall not be entitled to avail himself of the provisions of this Convention which exclude or limit his liability.
Article 10
(1) The consignor is responsible for the correctness of the particulars and statements relating to the cargo which he inserts in the air waybill.
(2) The consignor will be liable for all damage suffered by the carrier or any other person by reason of the irregularity, incorrectness or incompleteness of the said particulars and statements.
Article 11
(1) The air waybill is prima facie evidence of the conclusion of the contract, of the receipt of the cargo and of the conditions of carriage.
(2) The statements in the air waybill relating to the weight, dimensions and packing of the cargo, as well as those relating to the number of packages, are prima facie evidence of the facts stated; those relating to the quantity, volume and condition of the cargo do not constitute evidence against the carrier except so far as they both have been, and are stated in the air waybill to have been, checked by him in the presence of the consignor, or relate to the apparent condition of the cargo.
Article 12
(1) Subject to his liability to carry out all his obligations under the contract of carriage, the consignor has the right to dispose of the cargo by withdrawing it at the aerodrome of departure or destination, or by stopping it in the course of the journey on any landing, or by calling for it to be delivered at the place of destination or in the course of the journey to a person other than the consignee named in the air waybill, or by requiring it to be returned to the aerodrome of departure. He must not exercise this right of disposition in such a way as to prejudice the carrier or other consignors and he must repay any expenses occasioned by the exercise of this right.
(2) If it is impossible to carry out the orders of the consignor the carrier must so inform him forthwith.
(3) If the carrier obeys the orders of the consignor for the disposition of the cargo without requiring the production of the part of the air waybill delivered to the latter, he will be liable, without prejudice to his right of recovery from the consignor, for any damage which may be caused thereby to any person who is lawfully in possession of that part of the air waybill.
(4) The right conferred on the consignor ceases at the moment when that of the consignee begins in accordance with Article 13. Nevertheless, if the consignee declines to accept the waybill or the cargo, or if he cannot be communicated with, the consignor resumes his right of disposition.
Article 13
(1) Except in the circumstances set out in the preceding Article, the consignee is entitled, on arrival of the cargo at the place of destination, to require the carrier to hand over to him the air waybill and to deliver the cargo to him, on payment of the charges due and on complying with the conditions of carriage set out in the air waybill.
(2) Unless it is otherwise agreed, it is the duty of the carrier to give notice to the consignee as soon as the cargo arrives.
(3) If the carrier admits the loss of the cargo, or if the cargo has not arrived at the expiration of seven days after the date on which it ought to have arrived, the consignee is entitled to put into force against the carrier the rights which flow from the contract of carriage.
Article 14
The consignor and the consignee can respectively enforce all the rights given them by Articles 12 and 13, each in his own name, whether he is acting in his own interest or in the interest of another, provided that he carries out the obligations imposed by the contract.
Article 15
(1) Articles 12, 13 and 14 do not affect either the relations of the consignor or the consignee with each other or the mutual relations of third parties whose rights are derived either from the consignor or from the consignee.
(2) The provisions of Articles 12, 13 and 14 can only be varied by express provision in the air waybill.
[Note: A new paragraph numbered as paragraph (3) was added by Article IX of the Protocol set out in Schedule III, infra.]
Article 16
(1) The consignor must furnish such information and attach to the air waybill such documents as are necessary to meet the formalities of customs, octroi or police before the cargo can be delivered to the consignee. The consignor is liable to the carrier for any damage occasioned by the absence, insufficiency or irregularity of any such information or documents, unless the damage is due to the fault of the carrier or his agents.
(2) The carrier is under no obligation to enquire into the correctness or sufficiency of such information or documents.
CHAPTER III
Liability of the Carrier
Article 17
The carrier is liable for damage sustained in the event of the death or wounding of a passenger or any other bodily injury suffered by a passenger, if the accident which caused the damage so sustained took place on board the aircraft or in the course of any of the operations of embarking or disembarking.
Article 18
(1) The carrier is liable for damage sustained in the event of the destruction or loss of, or of damage to, any registered baggage or any cargo, if the occurrence which caused the damage so sustained took place during the carriage by air.
(2) The carriage by air within the meaning of the preceding paragraph comprises the period during which the baggage or cargo is in charge of the carrier, whether in an aerodrome or on board an aircraft, or, in the case of a landing outside an aerodrome, in any place whatsoever.
(3) The period of the carriage by air does not extend to any carriage by land, by sea or by river performed outside an aerodrome. If, however, such a carriage takes place in the performance of a contract for carriage by air, for the purpose of loading, delivery or transhipment, any damage is presumed, subject to proof to the contrary, to have been the result of an event which took place during the carriage by air.
Article 19
The carrier is liable for damage occasioned by delay in the carriage by air of passengers, baggage or cargo.
Article 20
(1) The carrier is not liable if he proves that he and his agents have taken all necessary measures to avoid the damage or that it was impossible for him or them to take such measures.
(2) In the carriage of cargo and baggage the carrier is not liable if he proves that the damage was occasioned by negligent pilotage or negligence in the handling of the aircraft or in navigation and that, in all other respects, he and his agents have taken all necessary measures to avoid the damage.
Article 21
If the carrier proves that the damage was caused by or contributed to by the negligence of the injured person the Court may, in accordance with the provisions of its own law, exonerate the carrier wholly or partly from his liability.
Article 22
(1) In the carriage of passengers the liability of the carrier for each passenger is limited to the sum of 125,000 francs. Where, in accordance with the law of the Court seized of the case, damages may be awarded in the form of periodical payments, the equivalent capital value of the said payments shall not exceed 125,000 francs. Nevertheless, by special contract, the carrier and the passenger may agree to a higher limit of liability.
(2) In the carriage of registered baggage and of cargo, the liability of the carrier is limited to a sum of 250 francs per kilogram, unless the consignor has made, at the time when the package was handed over to the carrier, a special declaration of the value at delivery and has paid a supplementary sum if the case so requires. In that case the carrier will be liable to pay a sum not exceeding the declared sum, unless he proves that that sum is greater than the actual value to the consignor at delivery.
(3) As regards objects of which the passenger takes charge himself the liability of the carrier is limited to 5,000 francs per passenger.
(4) The sums mentioned above shall be deemed to refer to the French franc consisting of 65The sums mentioned above shall be deemed to refer to the French franc consisting of 65 ½ milligrams gold of millesimal fineness 900. These sums may be converted into any national currency in round figuresThe sums mentioned above shall be deemed to refer to the French franc consisting of 65 ½ milligrams gold of millesimal fineness 900. These sums may be converted into any national currency in round figures.
Article 23
Any provision tending to relieve the carrier of liability or to fix a lower limit than that which is laid down in this Convention shall be null and void, but the nullity of any such provision does not involve the nullity of the whole contract, which shall remain subject to the provisions of this Convention.
[Note: This provision was renumbered as paragraph (1) and another provision added as paragraph (2) by Article XII of the Protocol set out in Schedule III, infra.]
Article 24
(1) In the cases covered by Articles 18 and 19 any action for damages, however founded, can only be brought subject to the conditions and limits set out in this Convention.
(2) In the cases covered by Article 17 the provisions of the preceding paragraph also apply, without prejudice to the questions as to who are persons who have the right to bring suit and what are their respective rights.
Article 25
(1) The carrier shall not be entitled to avail himself of the provisions of this Convention which exclude or limit his liability, if the damage is caused by his wilful misconduct or by such default on his part as, in accordance with the law of the Court seized of the case, is considered to be equivalent to wilful misconduct.
(2) Similarly the carrier shall not be entitled to avail himself of the said provisions, if the damage is caused as aforesaid by any agent of the carrier acting within the scope of his employment.
[Note: A new article numbered as Article 25A was added by Article XIV of the Protocol set out in Schedule III, infra.]
Article 26
(1) Receipt by the person entitled to delivery of baggage or cargo without complaint is prima facie evidence that the same has been delivered in good condition and in accordance with the document of carriage.
(2) In the case of damage, the person entitled to delivery must complain to the carrier forthwith after the discovery of the damage, and, at the latest, within three days from the date of receipt in the case of baggage and seven days from the date of receipt in the case of cargo. In the case of delay the complaint must be made at the latest within fourteen days from the date on which the baggage or cargo has been placed at his disposal.
(3) Every complaint must be made in writing upon the document of carriage or by separate notice in writing despatched within the times aforesaid.
(4) Failing complaint within the times aforesaid, no action shall lie against the carrier, save in the case of fraud on his part.
Article 27
In the case of the death of the person liable, an action for damages lies in accordance with the terms of this Convention against those legally representing his estate.
Article 28
(1) An action for damages must be brought, at the option of the plaintiff, in the territory of one of the High Contracting Parties, either before the Court having jurisdiction where the carrier is ordinarily resident, or has his principal place of business, or has an establishment by which the contract has been made or before the Court having jurisdiction at the place of destination.
(2) Questions of procedure shall be governed by the law of the Court seized of the case.
Article 29
(1) The right to damages shall be extinguished if an action is not brought within two years, reckoned from the date of arrival at the destination, or from the date on which the aircraft ought to have arrived, or from the date on which the carriage stopped.
(2) The method of calculating the period of limitation shall be determined by the law of the Court seized of the case.
Article 30
(1) In the case of carriage to be performed by various successive carriers and falling within the definition set out in the third paragraph of Article 1, each carrier who accepts passengers, baggage or cargo is subjected to the rules set out in this Convention, and is deemed to be one of the contracting parties to the contract of carriage in so far as the contract deals with that part of the carriage which is performed under his supervision.
(2) In the case of carriage of this nature, the passenger or his representative can take action only against the carrier who performed the carriage during which the accident or the delay occurred, save in the case where, by express agreement, the first carrier has assumed liability for the whole journey.
(3) As regards baggage or cargo, the passenger or consignor will have a right of action against the first carrier, and the passenger or consignee who is entitled to delivery will have a right of action against the last carrier, and further, each may take action against the carrier who performed the carriage during which the destruction, loss, damage or delay took place. These carriers will be jointly and severally liable to the passenger or to the consignor or consignee.
CHAPTER IV
Provisions Relating to Combined Carriage
Article 31
(1) In the case of combined carriage performed partly by air and partly by any other mode of carriage, the provisions of this Convention apply only to the carriage by air, provided that the carriage by air falls within the terms of Article 1.
(2) Nothing in this Convention shall prevent the parties in the case of combined carriage from inserting in the document of air carriage conditions relating to other modes of carriage, provided that the provisions of this Convention are observed as regards the carriage by air.
CHAPTER V
General and Final Provisions
Article 32
Any clause contained in the contract and all special agreements entered into before the damage occurred by which the parties purport to infringe the rules laid down by this Convention, whether by deciding the law to be applied, or by altering the rules as to jurisdiction, shall be null and void. Nevertheless for the carriage of cargo arbitration clauses are allowed, subject to this Convention, if the arbitration is to take place within one of the jurisdictions referred to in the first paragraph of Article 28.
Article 33
Nothing contained in this Convention shall prevent the carrier either from refusing to enter into any contract of carriage, or from making regulations which do not conflict with the provisions of this Convention.
Article 34
This Convention does not apply to international carriage by air performed by way of experimental trial by air navigation undertakings with the view to the establishment of a regular line of air navigation, nor does it apply to carriage performed in extraordinary circumstances outside the normal scope of an air carrier’s business.
Article 35
The expression “days” when used in this Convention means current days not working days.
Article 36
The Convention is drawn up in French in a single copy which shall remain deposited in the archives of the Ministry for Foreign Affairs of Poland and of which one duly certified copy shall be sent by the Polish Government to the Government of each of the High Contracting Parties.
Article 37
(1) This Convention shall be ratified. The instruments of ratification shall be deposited in the archives of the Ministry for Foreign Affairs of Poland, which will notify the deposit to the Government of each of the High Contracting Parties.
(2) As soon as this Convention shall have been ratified by five of the High Contracting Parties it shall come into force as between them on the ninetieth day after the deposit of the fifth ratification. Thereafter it shall come into force between the High Contracting Parties who shall have ratified and the High Contracting Party who deposits his instrument of ratification on the ninetieth day after the deposit.
(3) It shall be the duty of the Government of the Republic of Poland to notify to the Government of each of the High Contracting Parties the date on which this Convention comes into force as well as the date of the deposit of each ratification.
Article 38
(1) This Convention shall, after it has come into force, remain open for accession by any State.
(2) The accession shall be effected by a notification addressed to the Government of the Republic of Poland, which will inform the Government of each of the High Contracting Parties thereof.
(3) The accession shall take effect as from the ninetieth day after the notification made to the Government of the Republic of Poland.
Article 39
(1) Any one of the High Contracting Parties may denounce this Convention by a notification addressed to the Government of the Republic of Poland, which will at once inform the Government of each of the High Contracting Parties.
(2) Denunciation shall take effect six months after the notification of denunciation, and shall operate only as regards the party who shall have proceeded to denunciation.
Article 40
(1) Any High Contracting Party may, at the time of signature or of deposit of ratification or of accession declare that the acceptance which he gives to this Convention does not apply to all or any of his colonies, protectorates, territories under mandate, or any other territory subject to his sovereignty or his authority, or any territory under his suzerainty.
(2) Accordingly any High Contracting Party may subsequently accede separately in the name of all or any of his colonies, protectorates, territories under mandate or any other territory subject to his sovereignty or to his authority or any territory under his suzerainty which has been thus excluded by his original declaration.
(3) Any High Contracting Party may denounce this Convention, in accordance with its provisions, separately or for all or any of his colonies, protectorates, territories under mandate or any other territory subject to his sovereignty or to his authority, or any other territory under his suzerainty.
[Note: A new article numbered as Article 40A was added by Article XVII of the Protocol set out in Schedule III, infra.]
Article 41
Any High Contracting Party shall be entitled not earlier than two years after the coming into force of this Convention to call for the assembling of a new international Conference in order to consider any improvements which may be made in this Convention. To this end he will communicate with the Government of the French Republic which will take the necessary measures to make preparations for such Conference.
This Convention done at Warsaw on the 12th October, 1929, shall remain open for signature until the 31st January, 1930.
[Here follow the signatures on behalf of the Governments of Germany, Austria, Belgium, Brazil, Denmark, Spain, France, Great Britain and Northern Ireland, the Commonwealth of Australia, the Union of South Africa, Greece, Italy, Japan, Latvia, Luxembourg, Norway, the Netherlands, Poland, Roumania, Switzerland, Czechoslovakia, the Union of Soviet Socialist Republics, and Yugoslavia.]
Additional Protocol
(With reference to Article 2)
The High Contracting Parties reserve to themselves the right to declare at the time of ratification or of accession that the first paragraph of Article 2 of this Convention shall not apply to international carriage by air performed directly by the State, its colonies, protectorates or mandated territories or by any other territory under its sovereignty, suzerainty or authority.
[This Additional Protocol was signed on behalf of the same countries as those above mentioned.]
- R.S., c. C-14, Sch. I
- Date modified: