Asbestos Mines and Mills Release Regulations (SOR/90-341)
Full Document:
- HTMLFull Document: Asbestos Mines and Mills Release Regulations (Accessibility Buttons available) |
- XMLFull Document: Asbestos Mines and Mills Release Regulations [38 KB] |
- PDFFull Document: Asbestos Mines and Mills Release Regulations [268 KB]
Regulations are current to 2021-02-15
Malfunction or Breakdown Reports
8 Where, pursuant to paragraph 5(b), the Minister requests information respecting the malfunction or breakdown of air pollution control equipment or process equipment, the owner or operator of the mine or mill shall, not later than two months after the request is made by the Minister, submit to the Minister, for any month in which a malfunction or breakdown occurs, the information required by the Malfunction or Breakdown Report set out in Schedule II.
Air Pollution Control Equipment Reports
9 Where, pursuant to paragraph 5(c), the Minister requests information respecting air pollution control equipment at a mine or mill, the owner or operator of the mine or mill shall submit to the Minister, for each operation referred to in paragraphs 3(1)(a) to (c), the information required by the Air Pollution Control Equipment Report set out in Schedule III, not later than two months after the request is made by the Minister and at such times thereafter as any change occurs in respect of the air pollution control equipment.
Signing of Reports
10 Any report submitted under section 6, 8 or 9, by a corporation shall be signed by an officer of the corporation authorized to sign the report on its behalf.
- SOR/93-231, s. 2(F)
- Date modified: