Asbestos Mines and Mills Release Regulations (SOR/90-341)
Full Document:
- HTMLFull Document: Asbestos Mines and Mills Release Regulations (Accessibility Buttons available) |
- XMLFull Document: Asbestos Mines and Mills Release Regulations [38 KB] |
- PDFFull Document: Asbestos Mines and Mills Release Regulations [172 KB]
Regulations are current to 2024-10-30
SCHEDULE III(Section 9)Air Pollution Control Equipment Report
Name of Owner or Operator
Address of Mine or Mill
Unit or Process
Volume of Inlet Gas (norm. m3/min)
Temperature of Inlet Gas ( °C)
Type of Air Pollution Control Equipment
Supplier of Air Pollution Control Equipment
Schedule of Installation
Engineering Design Initiated (date)
Air Pollution Control Equipment Ordered (date)
Air Pollution Control Equipment Delivery (date)
Field Construction Initiated (date)
Field Construction Completed (date)
Installation of Air Pollution Control Equipment Completed (date)
Start-up of Air Pollution Control Equipment (date)
(Attach copy of air pollution control equipment specifications and purchase order when order is placed or amended)
(Signature)
(Title)
(Date)
- Date modified: