SCHEDULE V(Sections 5 and 8)
Licensing Criteria for Mining and Milling Undertakings
Column I | Column II | Column III | Column IV | |
---|---|---|---|---|
Item | Water Use/ Deposit of Waste | Water Use and Deposit of Waste Permitted Without a Licence | Water Use and Deposit of Waste Requiring a Type “B” Licence | Water Use and Deposit of Waste Requiring a Type “A” Licence |
1 | Direct water use | Use of less than 100 m3 per dayFootnote for Licensing Criteria for Mining and Milling Undertakings* | Use of water for milling at a rate of less than 100 tonnes of ore per day, use of water for leaching other than production leaching or use of 100 or more cubic metres per day for undertakings other than milling or production leachingFootnote for Licensing Criteria for Mining and Milling Undertakings* | Use of water for milling at a rate of 100 or more tonnes of ore per day or use of water for production leaching |
2 | (1) Watercourse crossings, including pipelines, bridges and roads | Construction of a structure across a watercourse less than 5 metres wide at ordinary high water mark at point of construction | Construction of a structure across a watercourse 5 or more metres wide at ordinary high water mark at point of construction | None |
(2) Watercourse training including channel and bank alterations, culverts, spurs, erosion control, and artificial accretion | Training
| All other watercourse training | None | |
(3) Flood Control | Construction of a temporary structure | Construction of a permanent in-stream structure | None | |
(4) Diversions | Diversion of a watercourse that is less than 2 metres wide at ordinary high water mark at point of diversion | All other diversions | None | |
(5) Alteration of flow or storage by means of dams or dikes | Off-stream storage of a quantity of water less than or equal to 2 500 m3 | Off-stream storage of a quantity of water greater than 2 500 m3 and less than 60 000 m3, or instream storage of a quantity of water less than 60 000 m3 | All other alterations or storage | |
3 | Deposit of waste in conjunction with
| Any deposit of waste in conjunction with non-mechanized in-stream placer operations or with out-of-stream watercourse placer or testing operations, where no chemical additives are used and there is no direct or indirect deposit of waste to surface water | Any deposit of waste in conjunction with mechanized in-stream placer operations or with any operations where chemical additives are used | None |
| Any deposit of waste, other than from milling, where there is no direct or indirect deposit to surface water | Any direct or indirect deposit of waste to surface waters, or any deposit of waste from milling at a rate of less than 100 tonnes of ore per day | Deposit of waste from milling at a rate of 100 tonnes or more of ore per day |
Return to footnote *Does not include water taken from an artificial reservoir with no natural inflow.