Mackenzie Valley Federal Areas Waters Regulations (SOR/93-303)
Full Document:
- HTMLFull Document: Mackenzie Valley Federal Areas Waters Regulations (Accessibility Buttons available) |
- XMLFull Document: Mackenzie Valley Federal Areas Waters Regulations [91 KB] |
- PDFFull Document: Mackenzie Valley Federal Areas Waters Regulations [284 KB]
Regulations are current to 2026-09-30 and last amended on 2016-06-13. Previous Versions
2 In these Regulations,
- Act
Act means the Mackenzie Valley Resource Management Act; (Loi)
- groundwater
groundwater means all water in a zone of saturation beneath the land surface, regardless of its origin; (eau souterraine)
- undertaking
undertaking means an undertaking in respect of which water is to be used or waste is to be deposited, of a type set out in Schedule II; (entreprise)
- watercourse
watercourse means a natural watercourse, body of water or water supply, whether usually containing water or not, and includes groundwater, springs, swamps and gulches. (cours d’eau)
- SOR/2016-130, s. 3
Page Details
- Date modified: